Westway, W2

The motorway was built to form a link from Paddington to Ringway 1, the innermost circuit of the London Ringways network, part of a complex and comprehensive plan for a network of high speed roads circling and radiating out from central London designed to manage and control the flow of traffic within the capital.

This plan had developed from early schemes prior to the Second World War through Patrick Abercrombie’s County of London Plan, 1943 and Greater London Plan, 1944 to a 1960s Greater London Council scheme that would have involved the construction of many miles of motorway standard roads across the city and demolition on a massive scale. Due to the huge construction costs and widespread public opposition, most of the scheme was cancelled in 1973 and the Westway, the West Cross Route and East Cross Route in east London were the only significant parts to be built.

The route of the Westway was chosen to follow the easiest path from Western Avenue to Paddington by following the route of existing railway lines. Passing an eight lane elevated motorway through densely populated North Kensington, though, involved the clearance of a large number of buildings adjacent to the railway, particularly in the area west of Westbourne Park, where many roads were unceremoniously truncated or demolished to make way for the concrete structures.

The road was constructed with many advanced features, such as heating grids on slopes to control the formation of ice. It was planned and constructed in an era before environmental impacts were routinely considered, and it caused much controversy at the time for the effects it and the vehicles it carried had upon the local community and the environment. After completion a vast corridor of wasteland remained below the motorway.





Leave a Reply